Facility Profile

Chicago - Lombard Data Center

Cloudnium's newly acquired Lombard facility, formerly CyrusOne CHI5, brings a dedicated western Chicago footprint to our colocation portfolio.

60K

Sq Ft Building

14K

Sq Ft Raised-Floor Whitespace

2MW+

Critical Capacity

600+

Tons Cooling Capacity

Operational view

Plan your Lombard deployment with Cloudnium. Our team can scope your cabinet layout, power requirements, connectivity, and migration timeline. Critical capacity describes the facility; contact us for current deployable availability.

Power

2MW+ Critical Capacity

  • ✓ Two diverse power feeds
  • ✓ N+1 generator configuration
  • ✓ Generator capacity scalable to 3.2MW
  • ✓ At least 48 hours of onsite fuel storage
Cooling

High-Density Cooling

  • ✓ N+1 cooling configuration
  • ✓ Efficient air-cooled heat exchangers
  • ✓ 600+ tons of cooling capacity
  • ✓ 24-inch and 36-inch raised floor
Security

Controlled Access

  • ✓ Biometric and keycard access controls
  • ✓ 24/7/365 security
  • ✓ Cabinet and cage locking options
  • ✓ Comprehensive video surveillance
  • ✓ Individual cabinet and cage access controls

Network and expansion

  • ✓ Carrier-neutral connectivity and dark-fiber options
  • ✓ Network connection to downtown Chicago
  • ✓ Separate fiber and copper cable trays
  • ✓ Expansion areas for custom halls or offices

Fire protection

  • ✓ VESDA air-sampling detection
  • ✓ Photoelectric and ionization smoke detectors
  • ✓ Clean-agent first-stage suppression
  • ✓ Pre-action second-stage suppression

Plan a Chicago deployment

Bring your density target, rack count, compliance needs, and timeline. We will help map the right footprint.

Contact Sales